Emmie Pence August Newsletter IN THIS ISSUE API Connection Tips for Corrosion Mitigation Siemens Radar Level SALE OmniComic Communicate to 3rd Party SCADA Do you have remote sites that you are unable to connect to your existing SC... Aug 31, 2026 OmniSite News
Emmie Pence Sensor Failure Requirements for Lift Station Controllers: Defining Degraded Modes, Alarms, and Recovery π Key Takeaways Treat every sensor failure as a full state transition, with defined detection, degraded operation, operator alerts, recovery, and testing. Define Three Separate Layers: Separate the ra... Aug 19, 2026 OmniSite News
Emmie Pence Power Disturbance and Restart Requirements for Municipal Lift Station Controllers: A Specification Checklist π Key Takeaways Safe lift station recovery depends on clear event definitions, controlled pump re-entry, visible alarms, and tests for every requirement. Define Each Event: The author recommends separ... Aug 12, 2026 OmniSite News
Emmie Pence When Lift Station Telemetry Fails: Requirements for Local Control and Recovery π Key Takeaways Lift stations stay resilient when teams define, test, and prove local behavior for every failure before comparing equipment. Local Control Stands Alone: Telemetry backup cannot prove l... Aug 5, 2026 OmniSite News
Emmie Pence Your July Guide to Wastewater Operations Jul 2026 OmniSite Tech Tips Issue #24 IN THIS ISSUE Configure OmniSite's P2P Control Table API Connection Coming Soon OmniAdvantage Plan Plus Units OmniComic Configure OmniSite's P2P Control Table Con... Jul 29, 2026 OmniSite News
Emmie Pence Pump Sequencing and Setpoint Requirements for Municipal Lift Station Controllers π Key Takeaways Strong lift station requirements link every station condition to a clear response, adjustable setting, needed signal, exception, and verification method. Start With Station Facts: Team... Jul 27, 2026 OmniSite News
Emmie Pence Lift Station Controller I/O Planning: Matching Pumps, Sensors, and Future Capacity π Key Takeaways Build the lift stationβs I/O schedule from verified field needs before comparing controllers, or hidden gaps may surface during startup. Map Every Point: List every pump, sensor, alarm... Jul 20, 2026 OmniSite News
Emmie Pence How to Translate Wet-Well Operating Risks into Lift Station Controller Requirements π Key Takeaways Build lift station controller requirements from documented wet-well risks, then link each requirement to a clear, testable result. Trace Every Risk: Link each station risk to an observ... Jul 13, 2026 OmniSite News
Emmie Pence June Newsletter Jun 2026 OmniSite Tech Tips Issue #23 IN THIS ISSUE Updated Maps Page in GuardDog AI Analysis on Microscopic Sample Page FREE GuardDog Webinar OmniComic Updated Maps Page in GuardDog Visual View of St... Jul 1, 2026 OmniSite News
Emmie Pence From Planning to Plug-and-Play: The Next Steps Checklist for Lift Station Cellular Telemetry π Key Takeaways A prevention plan only works when it becomes a tested alarm path people can trust. Start With One Station: Choose one high-risk lift station first, then use that setup as the rollout m... Jun 22, 2026 OmniSite News
Emmie Pence Cellular SCADA Monitoring: Upgrading from Hardwired Telemetry Without the Headache π Key Takeaways Cellular SCADA monitoring gives utilities a practical way to replace fragile alarm paths without rebuilding everything. Start With Risk: Upgrade the station with the weakest alarm path... Jun 12, 2026 OmniSite News
Emmie Pence How to Spot Impending Lift Station Failures in Pump Data Trends π Key Takeaways Pump failures rarely come out of nowhere; the warning signs usually appear first in trend data. Watch Trend Changes: Rising amp draw, longer runtime, or weaker flow can show trouble be... Jun 9, 2026 OmniSite News